TESTING OF THE FIRE AND SMOKE DAMPER
Who requires testing for their fire smoke damper?
commissioning portland West Slope Portland OR 97225First, locate the closest supply air duct to your indoor AC unit. Then use a thermometer, even a refrigerator thermometer will work, and tape it just inside. Let your Air Conditioning run for about ten minutes then check and record the temperature.
Building Management System is used to control and monitor complex HVAC systems as per design intent. It is used to collect data about the performance of the building as well as energy consumption by individual equipment and systems.