Cnc Drill Line Tensile Tester

Cnc Drill Line Installers

"..We have drilled around 25,000 holes since purchasing our CNC Drill Line approximately four months ago. It used to take 5 minutes to drill each hole. We now spend approximately. 30 seconds per hole, which is a saving of 1875 man-hours over the course of 4 months. That's $84,375 for our shop! You can see that this machine will pay back in less than one years. This machine not only speeds up our production, but it also opens up the floor for new jobs.

Voortman machine are the leaders in structural steel fabricating technology. Voortman machines ensure steel fabricators have an advantage in the steel industry. They also optimize tonnage. Advantage-2 CNC beam drilling line is the backbone for any structural steel fabrication shop. This machine is built on a multi-spindle, high-speed, relentless carbide drilling. Advantage-2 is one the most profitable drill lines available in the steel business. This drill line has a heavy steel frame that will provide support for shops for the long-term. The Advantage-2 can run profiles without stopping production because of its roller feed design. An estimated Hundreds of global fabricators run hundreds to thousands of tons of steel through the Advantage-2s each year.

Peddimat is incredibly simple and intuitive, and takes less than an hour to learn, even if you have never worked on a computer in your life.

Voortman built the CNC Drill Line only for GSS Machinery. Voortman manages the installation, warranty, service and maintenance of the CNC Drill Line. Voortman is the service provider. GSS Machinery is available to help if needed.

9-axis Cnc

9-axis Cnc

The Advantage-2 is powered with 25 HP (18.5kW), Siemens spindle motors. Each drill spindle has 5-station tool changers. This advanced drilling technology ensures maximum operating time, drill hole quality and efficiency.

The CNC Drill Line can be operated easily and Avenger operators are the ones who lay out the floor. You don't need any prior computer knowledge and are given full training at the time of installation.

Cnc Drill Line Vessel Schedule

Voortman proudly supports our global clientele with technical support that is available 24 hours a days. Voortman's staff are highly skilled in all aspects of the service industry, including assembly and factory checkout. They have extensive experience with almost all machines. Voortman’s service staff is always there for you, and they have the knowledge to resolve any problems that arise.

All of our beam drill lines machines are equipped with central lubrication, linear guides, and a tool cooling to ensure smooth operation. There is a four-station tool changer within each coordinate system. This allows the machine to drill and mill, scribe, countersink, or tap as required. Tools can be easily swapped mid-operation. A positive beam positioning arm is attached to the feed conveyor. It allows for more precise positioning of the beam as it moves through the drillline. The rack and pinion system maintains.004" making our steel beam drilllines more accurate than friction roll machines.

Cnc Drill Line Vessel Schedule

N Drill Bit

A 4-axis layout attachment eliminates human error from manual layout methods. The part information can still be used after blasting, painting, or galvanizing.

Saw measurement options are available via the Voortman AccuMeasure Roller Feed measurement system. The AccuMeasure allows for complete handling versatility, while maintaining a streamlined CNC solution. Splitting apart a drill and a saw allows neither machine to wait for the other, maximizing production.

Cnc Drill Line Installers
Cnc Drill Line 6 Helix

Yes. There are many CNC Drill Lines outside. Weather protection must be provided for the control panel as well as the mobile platform. For photos of many of our outdoor installations, please contact us.

The CNC Drill Line can be programmed manually at the machine or in the office using the supplied Peddimat software. This software comes included with the AVENGER and can be installed on as many PCs in your office as you choose — this unlimited license is included with the purchase of your machine. It is the same software that is found on the machine itself and is the same software used on the CNC Drill Line and all Voortman CNC fabricating machinery.

Cnc Drill Line Vessel Schedule

Check our other pages :

Cnc Drill Line Wis

The CNC Drill Line may be programmed by hand at the machine, or remotely using the Peddimat Software. This software is included with the AVENGER. You can install it on as many computers as you want in your office. It is the same program that is on the machine.

Z-Reader Probe- This probe maps the surface's location. It can be operated manually and programmatically. The option is removed from danger and is not active while the cutting process is underway. It can be used for surface mapping or to verify surface at each point before the cutting process begins. It is responsible for initialization, or zeroing the device on the surface at beginning of a program. From there it tracks the difference or accumulates them.

Frequently Asked Questions

Drilling lines are used for lifting or lowering the drill pipe into the wellbore. They present a challenging application for wire ropes with repetitive high-load bending over sheaves.

Step one is to determine the beam's total load and live load. Identify the type of load that you are supporting (roof, floor, or non-snow) and then choose the span you require. Match the live load and total loads to the values in the tables. It will also list the thickness and depth of each required member. 26 September 2022

Tube may be stronger or lighter depending on how thick the C.

Size of an LVL beam for a 20-foot span: As a general rule, a GLULAM or LVL should measure 10-12 inches in depth and 3 inches in width for a span of 20 feet. This means that a GLULAM or 10-12 inch GLULAM is required for residential buildings or projects.

For small buildings, the distance between two reinforced columns is between 3-4m and 6-9m. Larger facilities that require large columns and lots of free space will have to be at least 6-9m. A distance of 5m is acceptable for ordinary structures. The maximum span is 7.5, while the minimum span is 2.5m.